|
Civil engineering pole
In order to answer the needs of our customers in the field of building and equipment of hydraulic works, we are fully invested in the construction of water reservoirs and pumping stations.
Project of Sidi Bouaatmane
Building and equipping an elevated reservoir of 500 m3 , a reservoir of 1000 m3 , a sewage lift station, a transforming station an overall enclosure in Sidi Bouaatmane.
Client: ERAC Tensift
Project Tamansourt
Building and equipping a half-buried reservoir with a capacity of 6000 m3 for conveying drinking water to the new city Tamansourt.
- Client: ERAC Tensift.
- Completion time: 12 months.
|