|
Drinking Water Conveyance Pole
With over 30 years experience in the water sector, SOTRADEMA is today a leader in Morocco in the field of drinking water infrastructure works :
- Pumping station
- Treatment station
- Drinking water conveyance
- Distribution networks
- Water towers
In a field based namely on competences, SOTRADEMA, with its solid experience, keeps on meeting needs of main national operators ( ERAC, ONEP, REGIES…)
Achieved projects, throughout the Kingdom, reflect the professionalism of the teams of SOTRADEMA.
SOME ACHIEVEMENTS IN THE DRINKING WATER POLE
| Drinking water supply works in 80 Douars and 3 peripheral riverside districts of the conveyance Bouregrag and Romani consisting in supplying and installing 147.200 ML of pipes with the implementation of 80 street fountains as well as related works. (ONEP) |
| Drinking Water supply works in the Royal Palace in Agadir with installation of PVC pipes with a diameter of 315 mm (PRIMARIOS). |
| Renewal works of a pipe with a 500 diameter in El Jadida (RADEEJ). |
| Supply and installation of distribution pipe DN 600 for the supply of drinking water from Ben Souda to Fès pipes in prestressed concrete and cast iron (RADEEJ). |
| Supply, transport and installation of pipe DN 600 for the supply of the low network of the city of Agadir (RAMSA). |
| Drinking Water Conveyance to Douars from the conveyance of Loukkous over a length of 90 km of pipelines DN 63 to DN 315 in PVC and cast iron for the ONEP ( Provinces LARACHE et KSR LAKHBIR) |
| Drinking Water Conveyance to Douars from the conveyance of Tlat Lakhsass over a length of 50.475 ml in PVC DN 50 to 225 and building 58 street fountains for the ONEP. |
| Conveyance works of 15.3 km of pipes DN 315 to Dn 500 in PVC and prestressed concrete in the city of Smara for the ONEP. |
| Consolidating and upgrading works of distribution networks in the centre of ZEGANGANE ( NADOR) over 58 km of pipes in DN 50 to DN 200 PEHD qnd PVC and the implementation of 600 branching off in favour of the ONEP |
| Drinking water conveyance works of the restructuring operation of Mehdya Kasba including FTP of 47 km of pipelines DN 90 to DN 315 PVC and related works for the RAK. |
|